Kingspan: Grenfell inquiry findings on K15 insulation, debarment review and criminal file: a public-record watch file compiled by Falling Shares Intelligence from filings and exchange disclosures, as of 2026-11-09. The Grenfell Tower Inquiry's Phase 2 report (4 September 2024) found that Kingspan made a false claim about its K15 insulation and, in the inquiry's words, knowingly created a false market in it.
From a 2005 fire test to the Grenfell Tower Inquiry's September 2024 findings, a paused government debarment review and police files now with prosecutors: what the record shows and what Kingspan says.
Falling Shares Intelligence, Edited by Wung Thomas, Editor-in-Chief. As of .
Summary
- The Grenfell Tower Inquiry's Phase 2 report (4 September 2024) found that Kingspan made a false claim about its K15 insulation and, in the inquiry's words, knowingly created a false market in it.
- Kingspan says the report shows the type of insulation was immaterial to the spread of the fire and that the failings were in part of its UK insulation business, not the wider group.
- The government's debarment review of Kingspan and six other firms was paused in July 2025 at the request of police and prosecutors; in September 2026 the Met said it had passed its files to the CPS, with charging decisions promised before June 2027.
Key figures
| Inquiry Phase 2 report | 4 Sep 2024 (Criticised K15 testing and marketing) |
|---|---|
| Debarment review paused | 10 Jul 2025 (Seven firms, Kingspan included) |
| Met files to CPS | 20 files (20 organisations and 54 individuals, none named; CPS decisions promised before June 2027) |
What the inquiry found on K15
A single 2005 test used to market K15
The Phase 2 report, as summarised by Irish media, found that Kingspan relied on a single 2005 fire test on a system whose components were not representative of a typical external wall. It found Kingspan claimed K15 was part of a successfully tested system, which allowed it to be sold for buildings over 18 metres, and called that a false claim. (2005)
Composition change and failed later tests
The inquiry found Kingspan changed K15's composition in 2006 without disclosing it and that systems using K15 failed fire tests in 2007 and 2008. It found the product was not withdrawn and that the change was concealed from the British Board of Agrement. (2006-2008)
2009 certificate and 'false market' conclusion
The report found Kingspan obtained a certificate in 2009 containing false statements about K15 and used it for many years to sell the product. It concluded that Kingspan knowingly created a false market in insulation for use on buildings over 18 metres. It was published on 4 September 2024. (2009; 4 Sep 2024)
Kingspan withdraws 2005 test reports
The Irish Times reported on 6 November 2020 that Kingspan had asked the Building Research Establishment to withdraw the fire-test reports it had used since K15's launch in 2005. Kingspan said the test had shortcomings and no longer reflected the product it had sold. It told the inquiry it learned K15 was used at Grenfell only after the fire. (Oct-Nov 2020)
Kingspan's response and the company's position
Kingspan says insulation type was immaterial
Kingspan welcomed the report, reiterated what it called wholly unacceptable historical failings in its UK insulation business, and said the report makes clear that whether insulation was combustible or non-combustible was immaterial to how the fire spread. It said those failings do not reflect how the group operates. (4 Sep 2024)
Kingspan says it had no role in the refurbishment
Kingspan has said it had no role in the design of the Grenfell Tower cladding system or its refurbishment and that K15 made up a small share of the insulation in the tower, about 5%, used without its knowledge. It points to the polyethylene-core aluminium composite cladding, which it did not make, as the main cause of the fire's spread. (2018-2024)
Government and criminal process
Government names Kingspan in debarment review
The UK government said it would investigate seven firms, Kingspan among them, to decide whether they should be barred from public contracts for professional misconduct under the Procurement Act 2023. A firm found to have engaged in misconduct would go on a debarment list that contracting authorities must consider. (Feb 2025)
Debarment review paused
Construction News reported that the debarment investigations into the seven firms were paused after the Metropolitan Police and Crown Prosecution Service told the Cabinet Office that continuing could unintentionally prejudice the criminal investigation and any future proceedings. (10 Jul 2025)
Police files passed to prosecutors
The Metropolitan Police said it had sent its Grenfell files to the CPS: 20 files covering 20 organisations and 54 individuals, for offences that include corporate manslaughter, gross negligence manslaughter, health and safety, fraud and misconduct in public office. The CPS has committed to charging decisions before the tenth anniversary of the fire in June 2027. (30 Sep 2026)
Standard
This file compiles inquiry reports, company statements and published reporting about Kingspan Group plc. Allegations are attributed to those who made them. An investigation is not a charge, a charge is not a finding, and nothing here is a finding of wrongdoing unless a competent authority has made one. The Grenfell Tower Inquiry is a statutory public inquiry whose findings are not criminal or civil judgments. Kingspan acknowledges historical failings in part of its UK insulation business, says the report found the type of insulation immaterial to the fire's spread, and is not reported to have been charged with any offence. Individuals are not named unless an official document names them and they are central; otherwise roles are used. This is news coverage for information only, not investment advice.
Right of reply
Kingspan Group plc, and anyone named in a record cited here, can send corrections or comments to info@fallingshares.com (or directly to the Editor-in-Chief, Wung Thomas, at wungthomas@fallingshares.com). Material responses will be published alongside the relevant entry.